London Borough of Havering
Havering HMO licensing: what applies and what to submit
Havering’s new selective and additional HMO schemes took effect on 18 March 2026. Havering is covered by new licensing schemes from 18 March 2026. We supply the certificates Havering’s licensing team typically asks to see — gas, electrical, fire safety and energy — from one visit, with reports usually issued within 24 hours.
Serving landlords, agents and property managers across Romford, Hornchurch, Upminster, Harold Hill and the rest of Havering.
Which licence applies
Licensing schemes in Havering
| Licence | Applies to | Notes |
|---|---|---|
| Mandatory HMO licence | 5 or more people from 2 or more households sharing facilities | National rule; applies in Havering and does not expire. |
| Additional HMO licence | HMOs outside the mandatory scheme | New scheme in effect from 18 March 2026. |
| Selective licence | Privately rented homes in the designated scheme area | New scheme in effect from 18 March 2026. Licences due to expire in 2026 were able to apply early from 25 January 2026. |
A property needs only one licence. The council decides which applies from the number of occupants and your location, but the fee is taken before the assessment, so check first. Send us your postcode and the number of people living there and we will tell you which one it is.
The application
Documents Havering typically asks to see
Most London councils ask for the same core documents. Havering may ask for more or fewer depending on the licence type, so check its current application form. We cover every item below from one appointment, so tenants are disturbed once.
| Document | What it must show |
|---|---|
| Floor plan | Every floor level, room uses and room sizes in square metres |
| EICR | Electrical Installation Condition Report covering every circuit and consumer unit |
| Gas Safety (CP12) | Current certificate where the property has a gas supply |
| Fire alarm test certificate | Current test certificate for the installed detection system |
| Emergency lighting certificate | Where emergency lighting is fitted |
| Fire Risk Assessment | Written assessment under the Regulatory Reform (Fire Safety) Order 2005 |
| EPC | Whole-building energy performance certificate |
Pricing
Certificate packs for Havering HMOs
| Pack | Includes | From (up to 4 lettable rooms) |
|---|---|---|
| Licence Essentials | Gas Safety (CP12), EICR, EPC | £395 |
| Full Licence Pack | Essentials plus Fire Risk Assessment, Legionella and PAT testing | £795 |
| Complete Pack | Everything above plus an asbestos management survey of common parts | £995 |
Prices are confirmed in writing before any visit is booked. Larger Havering properties are quoted on room count. Managing 3 or more properties? Ask about portfolio pricing.
Areas we cover
Where we work in Havering
We attend properties across Romford, Hornchurch, Upminster, Harold Hill, Rainham, Elm Park and the surrounding streets. Typical postcodes include RM1, RM2, RM3, RM5, RM7, RM11, RM12, RM13.
Questions
Havering HMO licensing FAQs
Do I need an HMO licence in Havering?
If 5 or more people from 2 or more households share a kitchen, bathroom or toilet, yes — a mandatory licence applies in every English borough. Smaller HMOs of 3 or 4 people may also need an additional licence in Havering.
Which certificates should I get first?
The gas safety certificate and EICR are the most commonly requested and the most likely to hold up an application if missing or out of date. We can supply all seven documents from one visit.
How long does it take?
We confirm a fixed quote and the earliest visit the same day, and reports are usually emailed within 24 hours of the visit, formatted to attach to Havering’s application.
Do you submit the application for me?
No. We supply the documents; the licence application is made by the licence holder or their agent.
What happens if I do not licence?
Unlicensed HMOs can face civil penalties of up to £40,000 and Rent Repayment Orders of up to 24 months’ rent for offences committed from 1 May 2026, plus possible prosecution.
Reviewed 2 October 2026 against public council information. Licensing schemes and fees change — confirm current requirements with Havering Council (havering.gov.uk) before applying.
Request a quote
Tell us about the property
A few details and we’ll come back with a fixed quote and the earliest slot, usually the same day.